Crews are closing a section of Phillip Fulmer Way on the UT campus to build a pedestrian bridge.

3 2 LINKEDIN 1 COMMENTMORE

(WBIR- UT Campus) Construction at the University of Tennessee's campus is set to close a section of Phillip Fulmer Way from Cumberland Avenue to Middle Drive Monday.

Drivers will still be able to access Middle Drive and the Hill by turning right from northbound Phillip Fulmer Way next to Neyland Stadium.

Crews are closing this section of road to build a pedestrian bridge.

The bridge will connect the new Student Union with the Hill.The road is set to reopen in early summer of 2014.

Read or Share this story: http://on.wbir.com/1bHjA6j